You don't have javascript enabled. Good luck with that.
Pencarian
Jaksel Kebut Hotmix Ruas Jalan di Kebayoran Lama Dan Pesanggrahan

Road Reparation in South Jakarta Accelerated

To accelerate the budget absorption, some road reparation project in South Jakarta will also be accelerated. It is targeted to finish in the upcoming September 2015. Such reparation will be done in Pesanggrahan and Kebayoran Lama with the width handled is 122,974 m2 and 11,313 tons tonnage capacity. 

I'm optimistic it will finish before rainy season, So in quality, it will be long lasting

"In Kebayoran Lama, its width is more local roads and connecting roads in Pesanggaran," said Head of South Jakarta Bina Marga Sub-Department, Agustion Ruhuseto mentions in Pesanggrahan, the roads that will be hotmixed is 12 points while in Kebayoran Lama is 27 points. 

"We're also asphalting emergency potholes to anticipate accident," he explained. 

A Ring Road will Be Constructed In Kelapa Dua Island

He assessed, the hotmixing depends on situation and condition. If it is residential road, then it will be done at noon, while for public road conducted at night.

"We don't want to disrupt the traffic, because the residents would complain. So, we conduct it at night as it is already spare and we can apply open-close system," he told. 

Ruhuseto stated on physical work could reach 100-200 a day. By accelerating it, he hoped the asphalting will be complete on target. 

"I'm optimistic it will finish before rainy season, so in quality, it will be long lasting," he hoped.

Linked News
Popular News indeks
  1. Open for All: Jakarta City Hall Welcomes Visitors for Namu Balai Kota

    access_time03-10-2026 remove_red_eye681 personDessy Suciati
  2. Transjakarta Reaffirms Ban on Busking in Mikrotrans and Bus Stops

    access_time02-10-2026 remove_red_eye514 personAldi Geri Lumban Tobing
  3. Jakarta Builds Five New Animal Health Centers to Expand Veterinary Services

    access_time30-09-2026 remove_red_eye511 personAldi Geri Lumban Tobing
  4. Commission D Supports Reserve Fund for Long-Term Infrastructure

    access_time02-10-2026 remove_red_eye484 personFakhrizal Fakhri
  5. 1,500 Runners and Pets Hit the Track for World Rabies Day Run 2026

    access_time03-10-2026 remove_red_eye480 personAnita Karyati